High Voltage Generators & Motors Inspection

Stage Inspection, Laboratory Test Witness, Packing Inspection of Electrica Machines that are produced in China: Brands-WEG/ABB/TECO/XEMC/JIAMUSI/HARBIN/SHANGHAI ELECTRIC/WOLONG/VEM

We provide a comprehensive Inspection Insights (IVR) after each visit/ Witness, according to customer specifications.

  • Manufacturer Quality Manual Review
  • Manufacture Quality Control Plan Review
  • Inspection and Test Plan Definition/Review
  • Data Sheet According to Customer Project Approved Drawings (General Assembly and Part Drawings)
  • Raw Material Test Reports
  • Weld Procedures and Procedure Qualification Records
  • Calibration Certificates for Test Equipment
  • Special Procedures & Special Qualifications
  • Generator/Motor Lab Running Test/Witness
  • Preservation, Packing and Shipping Procedure
  • Packing List
PointsTestsStandards
1Visual InspectionCustomer Standard
2Winding Resistance, Resistance of Temperature Sensors and anticondensation heatersIEC/EN 60034-1
3Insulation Resistance of Stator Winding tested with DC VoltageIEC/EN 60034-1
4Locked Roto Test at rated Current
5No load test at rated voltage and frequencyIEC/EN 60034-2
6Motor Run( Noise level, mechanical imbalance)Customer Standard
7Phase sequence test-Direction of rotationIEC/EN 60034-8
8High voltage test of stator winding, temperature sensors, anticondensation heatersIEC/EN 60034-1
9Vibration test (level B)IEC/EN 60034-14
PointsType of Tests
1No Load run test (before running-in)
2Running-in of the Motor
3Winding resistance test at cold conditions
4Insulation resistance test
5Locked rotor test at nominal current
6Temperature rise test Pn-Un from Cold conditions
7Phase current test at full load
8Performance test at Constant Torque
9Performance test at Constant Voltage
10Torque/Speed and Current/Speed load test
11No Load Test
12Phase Current test at no Load at Un
13Locked rotor test M, I, P=f(U)
14Coil Voltage withstand test (130% Un for 3 Mins)
15Vibration test (free suspension)
16Vibration test (rigid mounting)
17Amount of Cooling air test
18Overspeed test-1.2 nominal speed for 2 mins
19Sound power level test at no Load
20Sound power level test at full Load
21Partial Discharge test
22Shaft Voltage Test
23Turn to Turn insulation test at 130% for 3 Mins